Management of Change: plan changes early, implement them cleanly, prove every step
A change to a product, a plant or a process touches engineering, purchasing, production, quality and service. CaRD Plan turns it into one shared plan – with fixed steps, clear owners and evidence that builds itself.
Request a demoWhere changes fail
Not in the idea but in the implementation: who does what and when lives in e-mails, spreadsheets and meeting notes. Production learns about the new drawing too late, purchasing still orders the old revision, and in the end nobody can prove that every measure was actually carried out.
How CaRD Plan maps your change process
Every type of change becomes a template: assessment, approval, implementation steps, verification and effectiveness check – with predecessors, owners and expected times. Each actual change becomes its own plan created from it. Whatever gets stuck is recorded on the step and flows back into the template.
- Form-fit-function (FFF) changes and new developments with the same structure, just different steps
- Approvals as steps of their own – skipped only with a reason in the comment
- Drawings, bill-of-material extracts and test reports attached directly to the step
- Management overview of all running changes with progress and delay
Objects and costs per change
Which objects a change touches – material numbers, routings, change numbers – is defined by the activity in the catalogue; in the plan only the number is entered at each task. Estimated planned costs and the actual costs per task come on top. At the end the overview shows what the change cost and which objects it affected – also in the closing report. The tenant switches the function on when needed.
Integrate early instead of repairing late
Because the change exists as a plan with predecessors, everyone involved sees from the start when it is their turn. Purchasing, production and service are not surprised after the approval – they prepare their part while the assessment is still running.
Complements your existing change management
The change request and the bill of materials stay in your PLM or ERP system. CaRD Plan steers the implementation across all departments and proves it: who started, finished or skipped which step, when, and why – as a closing report and project archive.

Frequently asked questions
Does CaRD Plan replace the change process in our PLM or ERP system?
No, it complements it. Change request, bill of materials and document status stay in your PLM or ERP system. CaRD Plan plans and steers the implementation across all departments and records every step with person and time.
Can form-fit-function changes be mapped?
Yes. Create one template per type of change – for example an FFF-relevant change with customer approval and first-article inspection, and a shorter one for changes that are not FFF-relevant. Every actual change is then its own plan from the matching template.
How do I prove that a change was fully implemented?
Every action is recorded with person, time and comment. At the end CaRD Plan generates a closing report as PDF with all steps, times and findings and stores it with the project archive.
More use cases
Product development process
Product development from idea to production release: phases and quality gates as a template, tasks per department, live feedback and evidence for every gate.
Learn more →ERP cutover planning
ERP go-live without spreadsheet chaos: cutover plan as a template, rehearsals, live board and closing report – for SAP S/4HANA, Dynamics 365 or JD Edwards.
Learn more →Acceptance and test plans
Factory and site acceptance, software tests and validation runs as a plan: test steps in a fixed order, findings on the step, the protocol as PDF.
Learn more →Maintenance plans and shutdowns
Maintenance, shutdowns and overhauls of complex products and plants: the procedure as a template, teams live, every step recorded with person and time.
Learn more →System replacement and harmonisation
Move sites and companies onto one system, one after another: the procedure as a template, every wave its own plan, findings carried into the next one.
Learn more →Machinery and plant engineering
Commissioning, test sequences and acceptance at the customer as a plan: test steps in a fixed order, readings as findings, report-back straight from the phone.
Learn more →Medical devices, pharma and laboratory
For FDA-regulated and other regulated manufacturers: qualification, validation runs and changes as a plan, every step with person, time and comment.
Learn more →Aviation, energy, transport
Retrofits, product changes and system changeovers in safety-critical industries: exact order, Force only with a reason, complete history.
Learn more →Quality management
Sampling, inspections, releases and audits following the same procedure every time: planned as a template, done as a team, every step evidenced.
Learn more →Food and beverage
Product changeovers with allergen cleaning, HACCP checks, traceability tests and audit preparation as a plan – every step evidenced with person and time.
Learn more →See your own procedure in CaRD Plan
Tell us briefly what it is about – in 30 minutes we show you what the plan looks like.
CaRD Gesellschaft für EDV-Beratung mbH
Gutenbergring 2 · 69168 Wiesloch, Germany
Phone +49 6222 9256-0 · E-mail info@card.de